Copyright © 2021 Zhangjiagang Sokos machinery co., LTD.
All rights reserved.
This 3-in-1 filling machine is automatic washing,filling and capping. This washing filling capping machine is mainly used for Non-aerated carbon dioxide drink, such as mineral water, pure water and so on. The machine design is shorten the time for the drink material contact with outside, Increase the sanitation condition throughout economy benefit.
This type of washing, filling and capping machine is mainly used for filling non-gas carbonated beverages such as mineral water and pure water. The machine design adheres to the concepts of water saving, environmental protection and sanitation. The mechanical valve is adopted to save water by the water outlet mode; the bottle mouth is clamped for filling, which shortens the contact time between the beverage and the air.
Type | Automatic bottle filling machine |
Colour | Sliver Grey |
Usage | Liquid Filling &Packing |
Filling Valume | 300ml-2000ml |
Rinsing pressure | 0.2~0.3Mpa |
Power | 3ph,380V/50Hz,1.5~11.5KW, |
Other voltages can be customized,Filling accuracy is as high as 99.8% |
Washing - Into bottle way is air conveyor direct connection with bottle dial. |
Filling - 304/316 Stainless steel high precision filling nozzle |
Capping - Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping |
Accessories -Anti-rotation knife -Components are tightly fitted | Filling Valve -Open the valve once/twice -Precise liquid control | Capping head -Krones Technology -Suitable for plastic caps |
Down cam -The design of the lower cam makes the body more stable. | Mechanical valve -Brand new design,no water leakage. | Motor -Use well-known brands,ABB,Siemens,etc. |
-Use export standard packaging, wooden box -packaging -Delivered to Shanghai, Wuxi and other ports |
Model | CGF 8-8-4 | CGF 14-12-5 | CGF 18-18-6 | CGF 24-24-8 | CGF 32-32-10 | CGF 40-40-12 | CGF 50-50-15 | CGF 60-60-15 | CGF 72-72-18 |
Washing head | 8 | 14 | 18 | 24 | 32 | 40 | 50 | 60 | 72 |
Filling head | 8 | 12 | 18 | 24 | 32 | 40 | 50 | 60 | 72 |
Capping head | 4 | 5 | 6 | 8 | 10 | 12 | 15 | 15 | 18 |
Production capacity | 2000bph | 3500bph | 8000bph | 11000~14000bph | 15000~20000bph | 20000~28000bph | 23000~30000bph | 27000~35000bph | 35000~40000bph |
Bottle height | 330mm | 330mm | 330mm | 330mm | 330mm | 330mm | 330mm | 330mm | 330mm |
Bottle diameter | 50~100mm | 50~100mm | 50~100mm | 50~100mm | 50~100mm | 50~100mm | 50~100mm | 50~100mm | 50~100mm |
Bottle volume | 0.2~2L | 0.2~2L | 0.2~2L | 0.2~2L | 0.2~2L | 0.2~2L | 0.2~2L | 0.2~2L | 0.2~2L |
Rinsing pressure | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa | 0.2~0.3Mpa |
Rinsing water consumption | 0.5T/H | 0.5T/H | 0.5T/H | 0.5T/H | 0.5T/H | 0.5T/H | 0.5T/H | 0.5T/H | 0.5T/H |
Filling precision | ±2~3% | ±2~3% | ±2~3% | ±2~3% | ±2~3% | ±2~3% | ±2~3% | ±2~3% | ±2~3% |
Power | 3ph,380V/50Hz,1.5Kw | 3ph,380V/50Hz,1.5Kw | 3ph,380V/50Hz,2Kw | 3ph,380V/50Hz,3Kw | 3ph,380V/50Hz,5.5Kw | 3ph,380V/50Hz,5.5Kw | 3ph,380V/50Hz,7.5Kw | 3ph,380V/50Hz,7.5Kw | 3ph,380V/50Hz,11Kw |
Q: Are you a manufacturer or a trading company?
A: We are the source factory with 24 years of manufacturing experience in beverage machinery. Located in Jinfeng Town, Zhangjiagang City, Jiangsu Province, China. The transportation is convenient, very close to Pudong Airport and Sunan Shuofang Airport. If your itinerary includes a factory visit, we will pick you up.
Q: Do you have relevant certificates?
A: We have SGS, ISO, CE
Q: How long is your delivery cycle after you order the machinery?
Ar: Generally it is 40 working days.
Q: What kind of bottles can your filling machine fill? What is the capacity? How much output can be achieved?
A: The bottles can be glass bottles, plastic bottles, special-shaped bottles, cans, etc. The capacity can be from 200~2000ml. The output can meet 1000~20000BPH
Q: Do you have a relevant after-sales system?
A: We have a sound after-sales system.
1: 24 months warranty.
2: Many-to-one service, we will solve basic problems through phone, email, whatsapp, WeChat and video calls. The operation manual will be sent with the machine or via e-mail.
3: If conditions permit, the engineer will go to the buyer's factory to install and test the machine, and train the buyer's staff on how to operate and maintain the machine.
Q: If our bottle size changes, can we make some adjustments on the machine according to our new bottle?
A: Yes. We will customize the mechanical design according to the customer's needs and make the final confirmation.
Q: If I want to buy a machine, what information do I need to tell you?
A:
1: What liquid do you want to fill?
2: What is the capacity and height of the bottle?
3: What is the output in one hour?
4: Related water quality analysis reports, etc.
5: Required mechanical voltage
Q: What kind of products do you offer?
A: We provide drinking water/juice/carbonated drinks/energy drinks/sparkling water/5 gallons/20L whole line solutions.
The machinery includes: water treatment system, blending system, bottle blowing machine, filling machine, labeling machine, film wrapping machine, inkjet printer, carton packaging machine, etc.
Q:How to ensure that you deliver goods on time and ensure the safety of my funds?
1:We guarantee the on-time delivery and quality of the equipment you purchase through the credit insurance service of the Alibaba platform.
2:With the letter of credit, you can easily lock in the delivery time.
3:After visiting the factory/video watching the factory, you can ensure the authenticity of our bank account.
Q:How do you ensure the quality of the machine?
1:To ensure the accuracy of parts. We are equipped with a variety of professional processing equipment, plus professional processing methods accumulated over the years.
2:Before the machine is assembled, each part is inspected by the inspector.
3:Assemble machines, all with masters with more than 5 years of work experience to operate.
4:After all the equipment is completed, we will connect all the machines and allow at least 12 hours for a complete production line. To test its stability